Westron (Kharkov, Ukraine) specializes in performance of totality of works on Technological Process Instrumentation & Control Systems purposed for industrial enterprises, including I&C design solutions, manufacture, tests, deliveries, implementation, and maintenance for nuclear and fossil power plants and various applications in industry. Westron's activities embrace all the stages of systems' life-cycle.
Westron was founded in 1994 by Hartron, leading Ukrainian enterprise of control systems design, and Westinghouse Electric Company (USA) - leading in the world nuclear power engineering.
The systems developed and manufactured by Westron operate successfully in all Ukrainian NPPs. Westron performs a considerable scope of works on I&C systems for Units in Ukraine, Russia, Armenia, Czechia, Bulgaria, Sweden, USA, Iraq and other countries.
Basic Westron's activities, products and services:
  • Comprehensive design, manufacture, test and shipment of industrial Monitoring and Control Systems based on the state-of-the-art industrial hardware and software platforms and technologies
  • Industrial I&C Information and Control Systems "turn-key"
  • Design and manufacture of industrial I&C electronic hardware
  • I&C system and functional design
  • Development of I&C application software
  • Software development
  • Assembly and integration
  • Start-up on site
  • System and equipment maintenance and repair during their operation
  • Training
  • Rendering services to enterprises on the development of their Quality Management Systems (QMS) to meet the requirements of International Standart ISO 9001:2008

Westron is staffed with high skilled personnel on system analysis and design, functional design, software, electronic hardware design, manufacture and testing of the systems and devices. Today Westron employs about 200 persons. Westron QMS meet in full the totality of the requirements specified by International and Ukrainian Standards of the series ISO 9001:2008 and Ukrainian Standards of the series DSTU ISO 9001:2009, also the requirements specified by USA Standard NQA-1 (the requirements on quality assurance of nuclear industry products). Westron QMS is covered by Certificate from TUV CERT Agency.
Westron's products are covered by Certificates of Compliance to the requirements specified for NPP equipment. Westron performs all the works in strict compliance with appropriate Standards of Ukraine and Customer's Standards. The General Director of Westron LLC is Michael A. Chernyshov.
Westron LLC
1 Akademika Proscury Str.,
Kharkiv 61070, Ukraine

Phone: +380-57-717-0601
Phone/Fax: +380-57-717-7956
E-mail: office@westron.kharkov.ua
Westron (Kharkov, Ukraine) specializes in performance of totality of works on Technological Process Instrumentation & Control Systems purposed for industrial enterprises, including I&C design solutions, manufacture, tests, deliveries, implementation, and maintenance for nuclear and fossil power plants and various applications in industry. Westron's activities embrace all the stages of systems' life-cycle.
Westron was founded in 1994 by Hartron, leading Ukrainian enterprise of control systems design, and Westinghouse Electric Company (USA) - leading in the world nuclear power engineering.
The systems developed and manufactured by Westron operate successfully in all Ukrainian NPPs. Westron performs a considerable scope of works on I&C systems for Units in Ukraine, Russia, Armenia, Czechia, Bulgaria, Sweden, USA, Iraq and other countries.
Basic Westron's activities, products and services:
EFFECTIVE SOLUTIONS FOR AUTOMATION
  • Comprehensive design, manufacture, test and shipment of industrial Monitoring and Control Systems based on the state-of-the-art industrial hardware and software platforms and technologies
  • Industrial I&C Information and Control Systems "turn-key"
  • Design and manufacture of industrial I&C electronic hardware
  • I&C system and functional design
  • Development of I&C application software
  • Software development
  • Assembly and integration
  • Start-up on site
  • System and equipment maintenance and repair during their operation
  • Training
  • Rendering services to enterprises on the development of their Quality Management Systems (QMS) to meet the requirements of International Standart ISO 9001:2015

MAIN PAGE      OUR NEWS     PRODUCTION      PROJECTS      CONTACTS      LINKS      PHOTO & VIDEO      MASS - MEDIA     EMPLOYMENT
May 02, 2018
Completion of Programs Testing Phase under WISCO-2 Project
Display team of Westron programmers successfully completed the main testing phase of developed program components of information-computation system.

May 02, 2018
Commissioning of the First Safety System SDGS ACS of RNPP Power Unit No.3
The first safety system standby diesel generator station automatic control system (SDGS ACS) supplied by Westron was commissioned at RNPP power unit no.3.

April 18, 2018
Equipment Supply for Rivne NPP Power Unit No.3 Radiation Monitoring System Modernization
Westron supplied a set of network equipment for power unit no.3 radiation monitoring system modernization (PU3 ARMS). 

March 20, 2018
NNEGC "Energoatom" Audited Westron's Quality Management System
Westron's quality management system audit on compliance to requirements of international standards ISO 9001:2015 and DSTU ISO 9001:2015 and Westron's productive capacity evaluation according to supplier's evaluation program of NNEGC "Energoatom" were completed.

March 15, 2018
SDGS Automatic Control System was Successfully Implemented at RNPP Unit No. 3
The system had been developed and supplied by Westron. This is the first successful project of the full-scale replacement of the SDGS ACS ACD 5600 equipment in Ukraine.

February 27, 2018
SDGS ACS of the Third Safety System of RNPP Unit No.3 Implementation into Operation
Standby diesel generator station automatic control system (SDGS ACS) of the third channel of safety system supplied by Westron to RNPP was implemented into operation at unit No.3.

February 06, 2018
Equipment for Radiation Monitoring System Upgrade was Supplied to Rivne NPP
This supply was made jointly with Czech company "VF a.s.".

January 16, 2018
Acceptance Tests of Radiation Monitoring System for RNPP
Factory acceptance tests of automated radiation monitoring system equipment set for auxiliary building No.2 (ARMS AB2) of Rivne NPP based on SHC "Vulcan-RK" had been successfully completed at Westron site.

January 15, 2018
Children's Party in Westron
Westron organized a festive event for children of Westron's employees dedicated to the Old Style New Year. 30 children in age from 5 till 12 gathered to participate in fun and fabulous activity, characters of fairytales and cartoons became the heroes of this event.

November 20, 2017
Westron Representatives Participated at the NNEGC "Energoatom" NPPs Lead Engineers Board meeting
The meeting of the NNEGC "Energoatom" lead engineers board took place at PJSC "Turboatom". Representatives of the power generating company and all nuclear power plants of Ukraine discussed the issues of nuclear power development in Ukraine.
Flag Counter