Information Bulletin No.68 Factory Acceptance Test of RD ACS SHC February 17, 2011
The software and hardware complex of the automatic control system is built on the “Vulkan-M” platform. The RD ACS SHC is developed jointly with the LvivORGRES OJSC (Lviv, Ukraine).
Delivery of Equipment February 4, 2011 Westron has completed delivery of equipment for radiation monitoring systems at the Dukovany NPP (Czech Republic). Equipment installation, starting-up and commissioning is planned for the period from February to August 2011.
Rovno NPP Unit ¹1 Reserve December 15, 2010 Rovno NPP upgrade and implementation of Reserve Diesel-Electric Power Units Automatic Control Systems (RDEPU ACS) for the Unit 1 first, second and third trains of Safety System have been successfully completed. The upgrade process of each RDEPU has resulted in replacement of outdated and obsolete equipment with modern digital ACSs for Diesel-Generator Rotary Speed Control, Generator Excitation Control and Protection; as well as 6kV switchgears, low-voltage switchgear and control gear assemblies, gauge, instrumentation and cabling replacement. Software and hardware complex (SHC) of RDEPU ACS “Vulcan-Ì-DG” is based on commercial “Vulcan-Ì” hardware manufactured by Westron and completely meets requirement specification approved by NAEK “Energoatom” and State Nuclear Regulation Committee of Ukraine. SHC “Vulcan-Ì-DG” is designed for updating of control systems for 15D100 and ASD-5600 diesel engines, Sulzer diesel engines and other diesel engines used at NPP.
Factory Acceptance Test December 8, 2010 Factory Acceptance Test of Gateways and Display Units equipment for Radiation Monitoring Systems for Modular Control Panels (MCP) and the Central Radiation Control Panel for Dukovany NPP (Czech Republic) has been successfully completed at Westron site. The equipment been constructed on the “Vulcan-M” platform test results have confirmed its compliance with the Technical Requirements and requirements of the applicable European standards. The delivery of the Radiation Monitoring Systems equipment for Dukovany NPP is scheduled on January 2011.
|